Wiefferink: AB Triple Membrane Roof Gasholder
Air-Blown cover now with extra separated biogas and upgraded biomethane storage, all under one roof
WIEFFERINK HAVE ADDED AN EXTRA MEMBRANE LAYER TO THEIR ALREADY OUTSTANDING AIR -BLOWN DOUBLE MEMBRANE COVER,
THIS INNOVATION OFFERS THE AD AND BIOMETHANE INDUSTRY THE OPPORTUNITY TO STORE BOTH UPGRADED BIOMETHANE GAS &
BIOGAS, ON THE SAME FOOTPRINT - A NEXT LEVEL DESIGN EVOLOUTION
Wiefferink's cutting edge techniques and customer insight provide biomethane plants with flexibility to:-
Wiefferink - Service Boxes for AD Plant Agitation
Wiefferink Service Hatch/ Agitator Installation
Particularly suited to Biomethane plants, that need to ensure an 02 free gas supply.
The agitator service port that allows agitator service / replacement whilst the roof remains inflated, and the digester remains in operation, producing gas, and preventing contamination with air.The system is based around a stainless steel platform that is bolted to the topmost rim of the digester vessel, immediately above the appropriate agitator- mounting pole.